The methods proved less than effective in meeting our goals. However, the testing did bring a greater understanding of real-time filtering of the river.
Two banks - 6 unit BBUV systems were introduced into their purification system to achieve WV-K's desire for 83m3 or 1,992m3 per day requires 1,383 LPM.